2007 HONOR Award Presented by the Georgia Engineering Alliance for Engineering Excellence

Scope of Work

The Nancy Creek Capacity Management Tunnel Pump Station is located at the R.M. Clayton Water Reclamation Center at the end of a new Nancy Creek interceptor wastewater collection tunnel. The Nancy Creek Capacity Management Tunnel, provided by others under a separate contract, is a deep underground bored tunnel design that provides storage and surge capacity for existing sewer flows into the R.M. Clayton Water Reclamation Center.

SLKA provided MEP and fire protection plans as well as instrumentation. Responsibilities included: design of the pump station control system, electrical power distribution system, building mechanical services (HVAC, plumbing, and fire protection), and mechanical design of the odor control system.